Designating a Facility on the Manifest
On the manifest, the generator must specify both a designated facility that is permitted to handle the waste that is described on the manifest and an alternate facility that is permitted to handle the materials in case the designated facility becomes unable to do so.
The following are exceptions to the foregoing requirements:
- Generators that produce between 100 kilograms and 1,000 kilograms of hazardous waste in a calendar month. For the specific rules regarding this exception, refer to 40 CFR 262.20.
- Generators that transport hazardous waste on property that they own, or for which they have a public or private right-of-way. For the specific rules regarding this exception, refer to 40 CFR 262.20.
To learn more about RCRA safety standards visit our RCRA Refresher Online Training web page.
THE BEST ONLINE TRAINING EXPERIENCE POSSIBLE
Fast
Your time is valuable. We've designed our site to be as fast as possible.
Easy to use
You'll never get lost or confused with us.
Immediate Access
There's no waiting period. Begin the course as soon as you sign up.
Anywhere Anytime
Internet connection and a computer, tablet, or smartphone.
Up to date
We update our courses as soon as new regulations come out.