Decontamination Procedures - Decontamination Facility Design
Before decontamination begins, it is important to have a Decontamination Facility Design that will allow for the safest decontamination of all known and suspected hazardous chemicals and wastes. It will utilize the Contamination Reduction Zone (CRZ), Exclusion Zone (the contaminated area), and the Support Zone (the clean area). You will remember these designations from Unit 4 ("Characterizing Sites").
Later in this unit, you will look at different layouts based on the level of personal protective equipment (PPE) used in site decontamination. For now, note that Decontamination Facility Design is an important part of the planning process for decontamination procedures.
To learn more about HAZWOPER visit our HAZWOPER 40 Hour Online Training web page.
THE BEST ONLINE TRAINING EXPERIENCE POSSIBLE
Fast
Your time is valuable. We've designed our site to be as fast as possible.
Easy to use
You'll never get lost or confused with us.
Immediate Access
There's no waiting period. Begin the course as soon as you sign up.
Anywhere Anytime
Internet connection and a computer, tablet, or smartphone.
Up to date
We update our courses as soon as new regulations come out.