Accessibility Icon
Search icon.Shopping cart icon.

Maximize Dry Dust Collection

Implementing these steps to maximize dry dust collection will help protect workers from exposure during rock drilling:

  • Provide inside corner flaps for deck shrouds (or skirts).
  • Install an air-ring seal where the drill pipe passes through the drill deck.
  • Install or upgrade dust collector fans so that the collector airflow and bailing airflow ratio is greater than 3:1.
  • When it is safe to do so, raise the level of the drill in small steps as the job progresses to minimize dust leakage between the deck shrouds (or skirt) and the ground.
  • Enclose the area around the collector with brattice cloth or a flexible hose to prevent recirculation of dust that has already been collected.
  • Lower the deck shroud (or skirt) after it has been lifted to shovel cuttings.
  • Use proper dust control equipment.
  • Maintain dry dust collectors when performing rock drilling.
  • Change collection filters according to the manufacturer's directions, or when they no longer work properly.
  • Maintain deck shrouds (or skirts). Replace torn shroud material, and make sure that the shroud is as long as possible, without it being dragged on the ground when the drill is lowered.

To learn more about Construction Silica visit our Construction Silica Safety Online Training web page.

THE BEST ONLINE TRAINING EXPERIENCE POSSIBLE

Fast

Your time is valuable. We've designed our site to be as fast as possible.

Easy to use

You'll never get lost or confused with us.

Immediate Access

There's no waiting period. Begin the course as soon as you sign up.

Anywhere Anytime

Internet connection and a computer, tablet, or smartphone.

Up to date

We update our courses as soon as new regulations come out.