Accessibility Icon
Search icon.Shopping cart icon.

Waterways - Permit Requirements

Division 1.5 Materials, Ammonium Nitrate, and Ammonium Nitrate Mixtures

To transfer, load, or unload Division 1.5 materials, ammonium nitrates, and certain ammonium nitrate filters, a permit is required from the COPT.

The following materials may be loaded or unloaded without a permit:

  • Ammonium nitrate, Division 5.1 oxidizer, UN 1942
  • Ammonium nitrate fertilizer, Division 5.1 oxidizer, UN 2067
  • Division 1.5 compatibility group D material
  • Ammonium nitrate fertilizer, Class 9, UN 2071.

For additional permit requirements and their exceptions, see §176.415 (c) (1-4).

To learn more about Waterways HAZMAT visit our DOT Waterways HAZMAT Online Training web page.

THE BEST ONLINE TRAINING EXPERIENCE POSSIBLE

Fast

Your time is valuable. We've designed our site to be as fast as possible.

Easy to use

You'll never get lost or confused with us.

Immediate Access

There's no waiting period. Begin the course as soon as you sign up.

Anywhere Anytime

Internet connection and a computer, tablet, or smartphone.

Up to date

We update our courses as soon as new regulations come out.